On-site engineering installation photos (II). This case covered a continuous row of multi-unit installations; a unified baseline controlled the overall look — even spacing between units and evenly distributed fixing points — demonstrating the workmanship level of bulk installation.

IndustryGeneral Engineering Installation
Inquire this item

This project was a continuous bulk installation where the key challenge was overall visual consistency. We first set up a unified baseline, then positioned each unit against it, ensuring the whole row was level with even spacing.

All fasteners were our own matching metal components with calculated load capacity; after installation, tensile spot-checks and overall commissioning confirmed stable, reliable quality.