On-site engineering installation photos (III). Installation on a building facade; crew followed height-work protection and safety rules, with precise positioning and rational load paths — the finished result is flat and neat.
This case was a high-rise facade installation. Before works, we assessed the building structure's load capacity and determined anchor points and load paths to ensure firm, safe installation.
Crew worked in line with height-work regulations with continuous safety supervision; after completion, the site was cleared and every fixing point was re-checked for tightness — delivery met acceptance standards immediately.